| Title |
Issue |
Page |
| A Review of ASME's External Pressure Calculations |
February 1996 |
20 |
| A Survey of Impact Load Analysis in CAESAR II |
December 1998 |
12 |
| A Technique for the Analysis of Non-Simultaneously Thermally Displaced Piping Systems (Hot Tapping) |
October 1996 |
13 |
| AISC Unity Checks on Pressure Vessel Legs |
August 1992 |
8 |
| An Introduction to Time History Analysis |
December 1993 |
9 |
| API-650 Addendum |
April 1995 |
7 |
| API-650 Addendum 2 |
October 1996 |
17 |
| API-650 Differences 9th to 10th Editions |
June 1999 |
13 |
| API-650 Nozzle Flexibilities |
December 1993 |
6 |
| API-653 2nd Edition |
October 1996 |
18 |
| API-653 Tank Bottom Inspection and Evaluation |
October 1996 |
9 |
| Applying API-653 |
April 1995 |
7 |
| ASCE 93 & 95 Comparisons |
January 2000 |
10 |
| ASCE 95 Wind Code Revision |
October 1996 |
16 |
| ASME B31G Criteria |
May 1993* |
27 |
| ASME Div 2 Nozzle Reinforcing Calculations |
December 1997 |
7 |
| ASME External Pressure Chart Name Changes |
December 1992* |
6 |
| Assessing the Metal Loss Flaws using API Recommended Practice 579 |
July 2003 |
14 |
| B31.3 - 2004 and CAESAR II |
December 2004 |
23 |
| Beam Element Limitations |
June 2000 |
19 |
| Benchmarking CAESAR II & ANSYS |
October 1991* |
3 |
| Bend Elastic Models |
March 1987* |
3 |
| Bend Flexibility Factor |
October 2002 |
18 |
| Buried Pipe Analysis |
April 1989* |
3 |
| Buried Pipe, The Overburden Compaction Multiplier |
March 1992* |
3 |
| CADWorx 2004 |
July 2003 |
23 |
| CADWorx Capabilities |
February 1996 |
9 |
| CADWorx Introduction |
February 1996 |
3 |
| CADWorx/Equipment |
July 2003 |
3 |
| CAESAR II Load Case Editor |
January 2001 |
19 |
| CAESAR II Quality Assurance Manual |
May 1993* |
5 |
| Calcium Silicate (Density) |
November 1994 |
4 |
| COADE Software Revision Procedures |
December 1997 |
4 |
| COADE Software Revision Procedures |
October 1996 |
7 |
| Cold Spring Discussion |
October 1990* |
11 |
| Collaboration with CADWorx/IP |
December 2004 |
10 |
| Combining Models in CAESAR II |
February 1996 |
8 |
| Conversion of Legacy P&ID Drawings |
December 1998 |
9 |
| Coordinate Systems |
February 2002 |
9 |
| Defining Ground Motion |
October 2002 |
7 |
| Double Rod Modeling |
July 1990* |
11 |
| Dynamic Questions & Answers |
July 1990* |
8 |
| Dynamics Basics |
March 1987* |
3 |
| Dynamics Basics Part 1 |
November 1987 |
3 |
| Dynamics, Damped Harmonic Motion |
April 1989* |
7 |
| Dynamics, The Range Check |
Nov 1988* |
4 |
| E-mail Announcement Procedures |
July 2003 |
4 |
| ESL's and Multiple Computers |
August 1992 |
2 |
| Estimation of Nozzle Loads |
December 1993 |
14 |
| Evaluation of Creep Stresses |
May 1993* |
18 |
| Evaluation of Fatigue Stresses |
December 1992* |
12 |
| Expansion Case for Temperatures Below Ambient |
May 1993* |
32 |
| Expansion Joint Modeler (Part 1) |
May 1993* |
29 |
| Expansion Load Case Requirements |
July 2003 |
11 |
| Fatigue Analysis Using CAESAR II |
December 1998 |
18 |
| FE/Pipe-CAESAR II SIFs & Flexibilities |
December 1992* |
8 |
| FE/Pipe-CAESAR II Transfer Line Study |
March 1992* |
6 |
| Fighting Spam |
July 2003 |
19 |
| Fine Tuning & Sensitivity Studies |
November 1994 |
6 |
| Finite Elements in Practice |
March 1992* |
16 |
| Flange Allowable Stresses |
October 1991* |
6 |
| Flange Design (Influence of Corrosion On ...) |
June 1994 |
6 |
| Flange Leakage |
October 1991* |
3 |
| Flange Rigidity Calculations |
June 1994 |
5 |
| Flange Stresses |
December 1992* |
7 |
| Frequency Phase Pairs & Harmonic Analysis |
February 2002 |
18 |
| Genesis of PDMS to CAESAR II Transfer Tool |
June 1998 |
19 |
| Global to Local Coordinates |
July 2001 |
15 |
| Global vs Local Coordinate Systems |
December 1992* |
3 |
| Global vs Local Coordinate Systems (Bends) |
November 1994 |
4 |
| Graphics Speed Issues |
July 2003 |
5 |
| Hanger Design Discussions (Part 1) |
March 1990* |
4 |
| Hanger Design Discussions (Part 2) |
October 1990* |
7 |
| Hillside & Off Angle Nozzles |
December 1993 |
7 |
| Hillside Nozzle Angle Calculations – revisited |
February 1996 |
12 |
| Hinges, Ball Joints & Friction in CAESAR II |
June 1999 |
14 |
| How Code Case 2290 Impacts Vessel Software |
December 1998 |
8 |
| How to use WRC107 in COADE Software Programs |
June 1997 |
9 |
| Hydrodynamic Loading |
January 2000 |
5 |
| Improving Support with Netmeeting |
June 1999 |
10 |
| Incorrect Results From Piping Analysis |
December 1998 |
8 |
| Interfacing CAESAR II and CADWorx |
February 1996 |
16 |
| Internal Pressure, Thrust Loads on Nozzles using WRC368 |
July 2001 |
9 |
| Large Rotation Rods |
November 1987 |
9 |
| Large Rotation Rods and Hangers |
March 1987* |
9 |
| Layouts in AutoCAD 2000 and CADWorx/PIPE |
January 2000 |
13 |
| Machine Times |
May 1988* |
2 |
| Mass Spacing for Dynamic Analysis |
July 2003 |
13 |
| Material Database Merging |
July 2001 |
15 |
| Maximum Shear Stress Intensity |
August 1992 |
4 |
| Memory Requirements |
May 1988* |
2 |
| Missing Mass Correction in Spectral Analysis |
May 1993* |
8 |
| Modeling Large D/d Tees |
December 1998 |
6 |
| Modeling Sway Brace Assemblies in CAESAR II |
January 2000 |
3 |
| Modeling Victaulic Couplings |
June 1998 |
16 |
| Modeling Widely / Closely Spaced Miters |
June 2000 |
16 |
| Network Questions & Answers |
April 1995 |
5 |
| Network Versions |
June 1994 |
1 |
| New API-650 Bolting Procedures |
December 2004 |
14 |
| Numerical Sensitivity Checks |
March 1987* |
9 |
| Octahedral Shear Stress |
March 1987* |
4 |
| ODBC Data Export |
June 2000 |
11 |
| On-Line Registration |
June 1999 |
12 |
| Pipe Stress Analysis of FRP Piping - Part 1 |
December 1997 |
10 |
| Pipe Stress Analysis of FRP Piping - Part 2 |
June 1998 |
11 |
| Piping Failure Caused by Elastic Follow-Up |
August 1992 |
10 |
| Plastic Pipe Modeling |
April 1991* |
5 |
| Printer Configuration |
June 1994 |
13 |
| Pulse Table Generator |
November 1994 |
9 |
| Rectangular Vessel Computations |
June 1994 |
7 |
| Relative Rigid Stiffnesses |
December 1998 |
11 |
| Response Spectrum vs Static Methods and ASCE-7 98 |
February 2002 |
6 |
| Seismic Analysis of Tall Vertical Process Towers |
April 1995 |
15 |
| Selecting & Evaluating an Expansion Joint Assembly |
December 1993 |
12 |
| Sl/Sh and B31.1/B31.3 |
July 2001 |
17 |
| Slip Joint Modeling |
April 1991* |
9 |
| Software Quality Assurance |
October 1990* |
7 |
| Some Nuances of Spring Hanger Design |
March 1987* |
7 |
| Specifying Hillside Nozzles in PVElite |
December 2004 |
18 |
| Speed Benchmarks (CAESAR II) |
June 1999 |
9 |
| Spring Cans with Friction |
February 1996 |
16 |
| Spring Hanger Design |
October 1990* |
4 |
| Static & Dynamic Analysis of High Pressure Systems |
March 1990* |
6 |
| Stress Analysis of Skirts |
December 2004 |
15 |
| Sustained & Expansion Follow Up |
Nov 1988* |
10 |
| Sustained & Expansion Stress Cases |
May 1988* |
4 |
| Sustained Stress Evaluation |
January 2001 |
12 |
| Tee Types |
March 1992* |
14 |
| Tees & SIFs |
March 1992* |
4 |
| The "Year 2000" Issue |
June 1999 |
13 |
| The Basics of Electronic File Transfer (E-Mail) |
June 1997 |
3 |
| Time History Input (Establishing...) |
June 1994 |
8 |
| Torispherical Head Equations |
December 1992* |
6 |
| Underground Pipe Modeling Philosophies |
April 1991* |
8 |
| Upgrading Access 97 to Access 2000 |
June 2000 |
14 |
| User-Specified Wind Profiles |
March 1992* |
14 |
| Vessel Stresses due to Seismic Pressure and Weight Loads |
October 2002 |
15 |
| Virus Infections |
July 1990* |
1 |
| Virus Infections (Revisited) |
June 1994 |
13 |
| Virus Update |
October 1990* |
2 |
| Web Site Debuts |
October 1996 |
1 |
| Web Site Enhancements |
June 1997 |
8 |
| Web Site Usage Increases |
December 1997 |
6 |
| What is ODBC? |
December 2004 |
21 |
| What Makes Piping/Finite Element Jobs Big? |
March 1987* |
2 |
| WRC107: Elastic vs Fatigue Analysis |
June 2000 |
24 |